1 turbines · operational · Buckinghamshire
| Status | Operational |
|---|---|
| County / region | Buckinghamshire |
| Turbines | 1 |
| Installed capacity | 1.5 MW |
| Turbine capacity | 1.5 MW |
| Tip height | 144 m |
| Operator (or applicant) | AWE Renewables |
| Turbine manufacturer | Vensys |
| Turbine model | not recorded |
Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.
From application to operation, this scheme took about 4 years.
Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 4908.
The application was determined in about 25 months. Permission was ultimately granted on appeal in March 2012. A planning permission on this site expired in March 2015. The scheme has been operating for about 12 years. That works out at 1.5 MW per turbine on average.