9 turbines · revised · Co. Antrim
| Status | Revised |
|---|---|
| County / region | Co. Antrim |
| Turbines | 9 |
| Installed capacity | 11.7 MW |
| Turbine capacity | 1.3 MW |
| Tip height | not recorded |
| Operator (or applicant) | Wheel House Energy |
| Turbine manufacturer | not recorded |
| Turbine model | not recorded |
Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.
The register also records a planning permission expiry in Mar 2020, after construction had started: an administrative date with no effect on the wind farm, left off the axis.
DevelopmentConstructionOperationAhead (repowering horizon at 22 years)
The register links a second scheme on this site (REPD ref 4558, Operational): 9 turbines · 2.3 MW each · applicant Energia (formerly Brookfield Renewable Energy Group). Two schemes on one site usually mean a repowering or an extension — to be confirmed with the operator.
Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 2990.
That works out at 1.3 MW per turbine on average.
See all wind farms in Co. Antrim.
| Data | Source | Extract |
|---|---|---|
| Site, capacity, status, planning milestones | Renewable Energy Planning Database (DESNZ, Open Government Licence v3) | Q2 2026, published 03/08/2026 |
| Turbine positions | OpenStreetMap contributors (ODbL) | 19/08/2026 |
| Manufacturer and model | OpenStreetMap tags, unverified — REPD does not record turbine models. Known for 41 % of UK turbines (manufacturer) and 32 % (model); some values are propagated within a site and may be wrong. | 19/08/2026 |