🌬️ Onshore wind farm

Red Gap Moor Wind Farm
Cleveland

Recorded in WhichWindTurbine: 5 wind turbines in operation. Point the app at one of them to see its profile in real time.

5
turbines
12.5 MW
MW total
2.5 MW
per turbine

📍 5 turbines mapped — each dot is a turbine recorded in the database. Average position: 54.65542 N · 1.32376 W.

Red Gap Moor Wind Farm

5 turbines · operational · Cleveland

Wind farm facts

StatusOperational
County / regionCleveland
Turbines5
Installed capacity12.5 MW
Turbine capacity2.5 MW
Tip heightnot recorded
Operator (or applicant)Capital Dynamics
Turbine manufacturernot recorded
Turbine modelnot recorded
Open this wind farm in WhichWindTurbine Interactive map + augmented-reality identification on site

♻️ Project timeline

Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.

→ ~20392010201520202025today1234
  1. 1May 2009 — Application submitted
  2. 2Mar 2011 — Permission granted
  3. 3May 2016 — Under construction
  4. 4Feb 2017 — Operational

The register also records a planning permission expiry in Mar 2010, in the same month as, or before, the permission was granted: it refers to an earlier permission, left off the axis.

DevelopmentConstructionOperationAhead (repowering horizon at 22 years)

From application to operation, this scheme took about 8 years.

Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 4415.

What the register tells us

The application was determined in about 22 months. Construction to first power took about 9 months. A planning permission on this site expired in March 2010. The scheme has been operating for about 9 years. That works out at 2.5 MW per turbine on average.

Sources and dates

DataSourceExtract
Site, capacity, status, planning milestonesRenewable Energy Planning Database (DESNZ, Open Government Licence v3)Q2 2026, published 03/08/2026
Turbine positionsOpenStreetMap contributors (ODbL)19/08/2026
Manufacturer and modelOpenStreetMap tags, unverified — REPD does not record turbine models. Known for 41 % of UK turbines (manufacturer) and 32 % (model); some values are propagated within a site and may be wrong.19/08/2026

Public data may lag behind operator figures. Spotted an error? Suggest a correction from the app.