Every repowering, decommissioning and expired planning permission recorded for UK wind in the government’s Renewable Energy Planning Database. One line per project, each traceable to the official register.

5
documented chains
37
repowering projects
8
decommissioned
93
farms past 22 years

♻ Before and after: fully documented sites

These sites appear twice in the register: once as a decommissioned project, once as its operational successor. Both records carry their own capacity, turbine count and commissioning date, so the change can be read directly rather than inferred.

Goonhilly Downs Wind Farm Repower

Cornwall — England
Before — decommissioned
14 turbines · 5.6 MW
0.4 MW per turbine · commissioned 01/01/1993
recorded as: Goonhilly Downs - Wind
After — operational
6 turbines · 12 MW
2 MW per turbine · commissioned 01/11/2010
Installed capacity +114% · register references 3004 and 3061

Delabole (Repowering)

Cornwall — England
Before — decommissioned
10 turbines · 4 MW
0.4 MW per turbine · commissioned 01/11/1991
recorded as: Delabole Wind Farm
After — operational
4 turbines · 9.2 MW
2.3 MW per turbine · commissioned 01/02/2011
Installed capacity +130% · register references 2948 and 3019

Spurness Wind Farm Repowering

Orkney Islands — Scotland
Before — decommissioned
4 turbines · 11 MW
2.75 MW per turbine · commissioned 01/12/2004
recorded as: Spurness Wind Farm
After — operational
5 turbines · 10 MW
2 MW per turbine · commissioned 01/12/2012
Installed capacity +-9% · register references 4036 and 3837

Carland Cross Wind Farm Repowering

Cornwall — England
Before — decommissioned
15 turbines · 6 MW
0.4 MW per turbine · commissioned 27/08/1992
recorded as: Carland Cross
After — operational
10 turbines · 20 MW
2 MW per turbine · commissioned 30/10/2013
Installed capacity +233% · register references 3005 and 3976

Ovenden Moor (Repower)

West Yorkshire — England
Before — decommissioned
23 turbines · 9.2 MW
0.4 MW per turbine · commissioned 01/06/1993
recorded as: Ovenden Moor
After — operational
9 turbines · 18 MW
2.5 MW per turbine · commissioned 24/01/2017
Installed capacity +96% · register references 2925 and 4408

🔧 Other repowering projects

Projects whose name in the register states a repowering, at every stage from application to operation. A refused or withdrawn application is kept here on purpose: it is part of the picture.

Hagshaw Hill (Repowering)
Lanarkshire — Scotland · 84 MW · 14 turbines · operator Scottish Power Renewables
operational · 01/11/2025
Furness Wind Farm/High Winds (Harlock Repowering)
Cumbria — England · 11.5 MW · 5 turbines · operator Baywind Co-op & Energy4All & Belltown Power
operational · 17/11/2016
Bloodhills - repowering
Norfolk — England · 1 MW · 2 turbines · operator The Farm Energy Partnership LLP
operational · 15/06/2015
Coal Clough Wind Farm Repowering
Lancashire — England · 16 MW · 8 turbines · operator Coal Clough Wind Farm
operational · 01/05/2015
Bradwell Wind Farm (Repower)
Essex — England · 20 MW · 10 turbines · operator Npower Renewables
operational · 30/09/2013
Great Eppleton Farm Repowering
Tyne and Wear — England · 8.2 MW · 4 turbines · operator E.ON UK
operational · 01/03/2010
Castle Pill - Repowering
Dyfed — Wales · 3.2 MW · 4 turbines · operator John Laing Environmental Assets Group
operational · 01/06/2009
Caton Moor Windfarm Repowering
Lancashire — England · 16 MW · 8 turbines · operator Hainsford Energy
operational · 01/06/2006
Haverigg Repowering (Haverigg II)
Cumbria — England · 1.2 MW · 5 turbines · operator Windprospect
operational · 01/05/2004
Llandinam Windfarm Repowering and Extension
Powys — Wales · 102 MW · 34 turbines · operator Scottish Power (formerly CeltPower Ltd/Eurus Energy)
consented · 07/09/2015
Rhyd-y-Groes Wind Farm - repowering
Gwynedd — Wales · 9.9 MW · 11 turbines · operator E.On / Eurus (TPG Wind)
consented · 21/10/2016
Rigged Hill Wind Farm (Repowering)
Co. Derry / Londonderry — Northern Ireland · 28 MW · 7 turbines · operator Scottish Power Renewables
consented · 05/10/2022
Corkey Windfarm (repowering)
Co. Antrim — Northern Ireland · 20 MW · 5 turbines · operator ScottishPower Renewables
consented · 02/03/2022
Windy Standard I Repower
Dumfries and Galloway — Scotland · 49.6 MW · 8 turbines · operator Fred Olsen Renewables
consented · 26/08/2025
Allison Wold Farm, Simon Howe - Wind Farm Repowering
North Yorkshire — England · 1.3 MW · 2 turbines · operator Allison Wold Power Limited
consented · 01/06/2023
Drumard Road (repowering)
Co. Derry / Londonderry — Northern Ireland · 0.5 MW · 1 turbines · operator PJT Power
in planning · 21/12/2018
Cold Northcott Windfarm Repowering
Cornwall — England · 22 MW · 22 turbines · operator RMA Environmental Limited
in planning · 27/11/2023
Beinn Ghlas Wind Farm - Repowering
Strathclyde — Scotland · 33.6 MW · 7 turbines · operator Nadara Limited (Beaufort Wind Limited)
in planning · 27/08/2025
Ben Aketil Wind Farm - Repowered & Extended
Highland — Scotland · 59.4 MW · 9 turbines · operator Falck Renewables Limited
in planning · 09/06/2023
Hare Hill Wind Farm Repowering
Strathclyde — Scotland · 130 MW · 23 turbines · operator SSE Renewables
in planning · 26/01/2026
Viking Energy Network, Blackett Street - Turbine Repowering
Tyne And Wear — England · 0.8 MW · 1 turbines · operator South Tyneside Council
in planning · 15/04/2026
Rogers Hill Farm -Wind Turbine Repowering
Dorset — England · 2 MW · 1 turbines · operator Distributed Generation Limited
in planning · 20/03/2025
Crystal Rig Phase 1 Repowering
Borders — Scotland · 72 MW · 10 turbines · operator Fred Olsen Renewables
in planning · 17/09/2025
Ovenden Moor (Repower)
West Yorkshire — England · 23 MW · 10 turbines · operator Yorkshire Windpower
revised application · 25/03/2009
Allison Wold Farm, Simon Howe - Wind Farm Repowering
North Yorkshire — England · 1.3 MW · 2 turbines · operator Allison Wold Power Limited
revised application · 22/08/2022
Chelker Reservoir Repower
North Yorkshire — England · 3.9 MW · 3 turbines · operator Kelda Water Services
withdrawn · 11/02/2011
Chelker Reservoir & Wind Farm Repower
North Yorkshire — England · 1.2 MW · 2 turbines · operator Yorkshire Water
refused · 06/05/2008
Chelker Reservoir Repower (Resubmission)
North Yorkshire — England · 1.7 MW · 2 turbines · operator Kelda Water Services
refused · 07/10/2011
Bu Wind Farm Repowering
Orkney Islands — Scotland · 2.6 MW · 3 turbines · operator Scottish and Southern Energy (SSE)
abandoned · 12/04/2013
Kirkby Moor Repowering
Cumbria — England · 18 MW · 6 turbines · operator RWE Renewables
refused · 28/02/2015
Headwind Taff Ely Wind Farm (Repowering)
Mid Glamorgan — Wales · 17.5 MW · 7 turbines · operator RWE Npower Renewables
permission expired · 23/04/2013
Tangy Wind Farm - repowering/Tangy 3
Strathclyde — Scotland · 36.8 MW · 16 turbines · operator Scottish and Southern Energy (SSE)
permission expired · 29/06/2015

🗑 Decommissioned, no successor in the register

Sites recorded as decommissioned for which the register holds no operational successor. That does not prove the site was not rebuilt — only that the register does not say so.

Blyth Offshore
Offshore — England · 4 MW · 2 turbines · operator Blyth Harbor Wind Ltd
decommissioned · commissioned 01/12/2000
Blood Hill Wind Farm
Norfolk — England · 2.3 MW · 10 turbines · operator ECONET LTD
decommissioned · commissioned 24/07/2000
Hunterston Test Centre
Strathclyde — Scotland · 13 MW · 2 turbines · operator Scottish Enterprise/SSE
decommissioned · commissioned 15/12/2015

⌛ Expired planning permissions

A wind farm can be stopped by the calendar rather than by its turbines. These 56 projects have a planning permission recorded as expired — 53 of them with a date.

ProjectWhereCapacityExpired
Hill Of LychrobbieHighland — Scotland2.4 MW16/04/2024
Hammars Hill Wind Farm ExtensionOrkney Islands — Scotland8.4 MW28/01/2024
Beltonanean 2Co. Tyrone — Northern Ireland2.3 MW18/04/2023
Isle of Luing Wind FarmArgyll and Bute — Scotland0.2 MW21/12/2023
Beinn MheadhonachHighland — Scotland4 MW20/08/2022
Cogle Moss Wind FarmHighland — Scotland36 MW29/08/2022
BraemoreHighland — Scotland54 MW27/10/2022
Hill of Towie II Wind FarmGrampian — Scotland48 MW16/06/2022
Stoney Hill FarmLanarkshire — Scotland2 MW01/11/2022
Hartwood WindfarmLanarkshire — Scotland21 MW24/11/2022
Herscha Wind energy Project (Extension)Grampian — Scotland1.6 MW09/03/2021
MeenakeeranCo. Tyrone — Northern Ireland12 MW17/01/2021
BARLOCKHART MOOR - extensionDumfries and Galloway — Scotland8.2 MW21/05/2021
Windy Edge Wind FarmBorders — Scotland27 MW01/12/2021
Eshmore Wind Farm ExtensionCo. Tyrone — Northern Ireland2.3 MW07/07/2021
Headwind Taff Ely Wind Farm (Repowering)Mid Glamorgan — Wales17.5 MW08/01/2020
Slieve Kirk ExtCo. Tyrone — Northern Ireland11.5 MW26/03/2020
Ora More ExtensionCo. Fermanagh — Northern Ireland6 MW17/12/2020
690 Metres east of no 4 Vestry RoadCo. Armagh — Northern Ireland2 MW02/11/2020
320mts South East of 43 Flush RoadCo. Antrim — Northern Ireland2 MW04/11/2020
Development SE of Flush RoadCo. Antrim — Northern Ireland2 MW04/11/2020
Craigs Wind Turbine IICo. Antrim — Northern Ireland3 MW31/01/2020
Hameldon Hill Wind Farm (extension 2)Lancashire — England7.1 MW28/07/2020
Maesgwyn Wind Farm - extension (Phase 2)Neath Port Talbot — Wales7 MW17/12/2020
North HaddoAberdeenshire — Scotland1.6 MW30/11/2020
Crookedstane FarmStrathclyde — Scotland11.4 MW19/01/2019
Lion Hill Wind Farm (Crookedstane Farm 2)Strathclyde — Scotland11.4 MW20/01/2019
DrumelzieWest Lothian — Scotland1.5 MW02/12/2019
South Priorhill FarmLanarkshire — Scotland1.5 MW16/08/2019
Kittymuir FarmLanarkshire — Scotland1.6 MW27/06/2019
Brackenhills FarmAberdeenshire — Scotland2.3 MW06/12/2019
Navidale EstateHighland — Scotland1 MW04/07/2019
Neilston Additional Wind TurbineStrathclyde — Scotland2.5 MW04/11/2018
CornaboGrampian — Scotland2.7 MW23/03/2018
Craigton and Spittalhill Wind FarmStirling — Scotland21 MW17/11/2018
Linburn FarmStrathclyde — Scotland1.7 MW05/11/2018
Evie Wind Energy ProjectOrkney Islands — Scotland2.3 MW12/01/2018
Hill of Carlincraig wind turbinesGrampian — Scotland4.6 MW02/07/2018
Heckington FensLincolnshire — England54 MW08/02/2018
Tangy Wind Farm - repowering/Tangy 3Strathclyde — Scotland36.8 MW29/06/2018

Showing the 40 most recent of 56.

📈 The wave ahead

Age of the operational UK wind fleet as recorded in the register. Reaching a given age does not mean a site will be repowered — it means the question arises.

Age reachedWind farmsInstalled capacity
30 years or more22191 MW
25 years or more57434 MW
22 years or more931084 MW
20 years or more1322104 MW
15 years or more3045961 MW

The oldest wind farms still recorded as operational:

CommissionedProjectWhereCapacity
1992Chelker ReservoirNorth Yorkshire — England1.3 MW · 4 turbines
1992Blyth Harbour Wind FarmNorthumberland — England2.7 MW · 9 turbines
1993Kirkby MoorCumbria — England4.8 MW · 12 turbines
1993Taff Ely Wind FarmMid Glamorgan — Wales9 MW · 20 turbines
1993Llandinam WindfarmPowys — Wales31 MW · 103 turbines
1993Coal Clough Wind FarmLancashire — England9.6 MW · 24 turbines
1993Royd MoorSouth Yorkshire — England5.9 MW · 13 turbines
1994Dyffryn Brodyn Wind FarmDyfed — Wales5.5 MW · 11 turbines
1994Bryn titli WindfarmPowys — Wales9.9 MW · 22 turbines
1994Corkey Wind FarmCo. Antrim — Northern Ireland5 MW · 10 turbines
1994Rigged Hill Wind FarmCo. Derry / Londonderry — Northern Ireland5 MW · 10 turbines
1995Bessy Bell Wind FarmCo. Tyrone — Northern Ireland5 MW · 10 turbines

Method and sources

Every figure on this page is read from the Renewable Energy Planning Database (REPD), Q2 2026 extract, published by the UK Department for Energy Security and Net Zero under the Open Government Licence. The REPD is the national register of every renewable electricity project above 150 kW, from first planning application through to decommissioning, covering England, Wales, Scotland and Northern Ireland since 1991.

What is inferred, and what is not. Statuses, capacities, turbine counts and dates are taken directly from the register. The pairing of a decommissioned project with its operational successor is our own, made on the site name: it is shown only where both records exist and the successor is the later of the two. Where the register holds no successor, we say so rather than assume a rebuild. Ages are computed from the recorded commissioning date; a 22-year threshold is used as a common reference point, not as a prediction.