Rigged Hill Wind Farm

10 turbines · operational · Co. Derry / Londonderry

Wind farm facts

StatusOperational
County / regionCo. Derry / Londonderry
Turbines10
Installed capacity5 MW
Turbine capacity0.5 MW
Tip heightnot recorded
Operator (or applicant)B9 Energy Services Ltd/ ScottishPower Renewables
Turbine manufacturernot recorded
Turbine modelnot recorded

♻️ Project timeline

Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.

1992 1995 1998 2001 2004 2007 2010 2013 2016 2019 2022 Original scheme Application submitted November 1993 Permission granted July 1994 Operational November 1994 Later scheme Application submitted August 2019 Permission granted October 2022

From application to operation, this scheme took about 1 year.

The register links a second scheme on this site (REPD ref 7489, Awaiting Construction): 7 turbines · 137 m tip height · applicant Scottish Power Renewables. Two schemes on one site usually mean a repowering or an extension — to be confirmed with the operator.

Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 3112.

What the register tells us

The application was determined in about 8 months. The scheme has been operating for about 32 years. At that age, wind farms commonly become candidates for repowering or life extension — nothing in the register confirms such a plan here. That works out at 0.5 MW per turbine on average.

Nearby