Recorded in WhichWindTurbine: 10 wind turbines in operation. Point the app at one of them to see its profile in real time.
📍 10 turbines mapped — each dot is a turbine recorded in the database. Average position: 55.02266 N · 6.82246 W.
10 turbines · operational · Co. Derry / Londonderry
| Status | Operational |
|---|---|
| County / region | Co. Derry / Londonderry |
| Turbines | 10 |
| Installed capacity | 5 MW |
| Turbine capacity | 0.5 MW |
| Tip height | not recorded |
| Operator (or applicant) | B9 Energy Services Ltd/ ScottishPower Renewables |
| Turbine manufacturer | Nordtank (now Vestas) (secondary source) |
| Turbine model | NTK500 (secondary source) |
Nordtank (now Vestas) · NTK500 · 10 turbines · 0.5 MW each
Source: Wikipedia, list of onshore wind farms in the United Kingdom (compiled from UKWED and The Wind Power), read on 2026-09-19. This is a compiled list, not a primary record. It is shown because two independent facts — turbine count and rated power — match the database exactly. Awaiting confirmation from a primary source.
Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.
DevelopmentConstructionOperationAhead (repowering horizon at 22 years)
From application to operation, this scheme took about 1 year.
The register links a second scheme on this site (REPD ref 7489, Awaiting Construction): 7 turbines · 137 m tip height · applicant Scottish Power Renewables. Two schemes on one site usually mean a repowering or an extension — to be confirmed with the operator.
Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 3112.
The application was determined in about 8 months. The scheme has been operating for about 32 years. At that age, wind farms commonly become candidates for repowering or life extension — nothing in the register confirms such a plan here. That works out at 0.5 MW per turbine on average.
See all wind farms in Co. Derry / Londonderry.
| Data | Source | Extract |
|---|---|---|
| Site, capacity, status, planning milestones | Renewable Energy Planning Database (DESNZ, Open Government Licence v3) | Q2 2026, published 03/08/2026 |
| Turbine positions | OpenStreetMap contributors (ODbL) | 19/08/2026 |
| Manufacturer and model | OpenStreetMap tags, unverified — REPD does not record turbine models. Known for 41 % of UK turbines (manufacturer) and 32 % (model); some values are propagated within a site and may be wrong. | 19/08/2026 |
Public data may lag behind operator figures. Spotted an error? Suggest a correction from the app.