Sancton Hill

5 turbines · revised · Humberside

Wind farm facts

StatusRevised
County / regionHumberside
Turbines5
Installed capacity10 MW
Turbine capacity2 MW
Tip heightnot recorded
Operator (or applicant)Cornwall Light and Power
Turbine manufacturernot recorded
Turbine modelnot recorded

♻️ Project timeline

Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.

2007 2008 2009 2010 2011 2012 2013 2014 2015 Original scheme Application submitted December 2008 Refused March 2009 Later scheme Application submitted May 2010 Permission granted February 2011 Under construction November 2011 Operational June 2012 Permission expired February 2014

The register links a second scheme on this site (REPD ref 3735, Operational): 5 turbines · 2 MW each · applicant REG Windpower (previously Cornwall Light and Power). Two schemes on one site usually mean a repowering or an extension — to be confirmed with the operator.

Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 3335.

What the register tells us

The register records a refusal in March 2009 before the scheme progressed. That works out at 2 MW per turbine on average.

Nearby