24 turbines · operational · Dumfries and Galloway
| Status | Operational |
|---|---|
| County / region | Dumfries and Galloway |
| Turbines | 24 |
| Installed capacity | 81.6 MW |
| Turbine capacity | not recorded |
| Tip height | 125 m |
| Operator (or applicant) | ERG |
| Turbine manufacturer | Vestas |
| Turbine model | V136-4.5 |
Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.
From application to operation, this scheme took about 5 years.
The register links a second scheme on this site (REPD ref 12079, Awaiting Construction): 6 turbines · 3.6 MW each · 149 m tip height · applicant Executive Resource Group. Two schemes on one site usually mean a repowering or an extension — to be confirmed with the operator.
Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 6703.
Construction to first power took about 28 months. A planning permission on this site expired in July 2023. The scheme has been operating for about 3 years. That works out at 3.4 MW per turbine on average.
See all wind farms in Dumfries and Galloway.