Shepham Lane

5 turbines · revised · East Sussex

Wind farm facts

StatusRevised
County / regionEast Sussex
Turbines5
Installed capacity12.5 MW
Turbine capacity2.5 MW
Tip heightnot recorded
Operator (or applicant)Galliford Try Renewables (GTR)
Turbine manufacturernot recorded
Turbine modelnot recorded

♻️ Project timeline

Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.

2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 Original scheme Application submitted September 2011 Later scheme Application submitted February 2013 Refused May 2013 Permission granted January 2015 Granted on appeal January 2015 Under construction August 2016 Operational January 2017 Permission expired January 2018

The register links a second scheme on this site (REPD ref 4326, Operational): 3 turbines · 2.5 MW each · applicant Foresight. Two schemes on one site usually mean a repowering or an extension — to be confirmed with the operator.

Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 3725.

What the register tells us

That works out at 2.5 MW per turbine on average.