🌬️ Onshore wind farm

Sibelco Brassington
Derbyshire

Recorded in WhichWindTurbine: 1 wind turbine in operation. Point the app at one of them to see its profile in real time.

1
turbines
2.3 MW
MW total
2.5 MW
per turbine

📍 1 turbine mapped — each dot is a turbine recorded in the database. Average position: 53.09084 N · 1.62682 W.

Sibelco Brassington

1 turbines · operational · Derbyshire

Wind farm facts

StatusOperational
County / regionDerbyshire
Turbines1
Installed capacity2.3 MW
Turbine capacity2.5 MW
Tip heightnot recorded
Operator (or applicant)Sibelco/ Golconda
Turbine manufacturernot recorded
Turbine modelnot recorded
Open this wind farm in WhichWindTurbine Interactive map + augmented-reality identification on site

♻️ Project timeline

Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.

→ ~2039201520202025today1234
  1. 1Apr 2011 — Application submitted
  2. 2Mar 2012 — Permission granted
  3. 3Feb 2015 — Under construction
  4. 4Sep 2016 — Operational

The register also records a planning permission expiry in Mar 2011, in the same month as, or before, the permission was granted: it refers to an earlier permission, left off the axis.

DevelopmentConstructionOperationAhead (repowering horizon at 22 years)

From application to operation, this scheme took about 5 years.

Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 3382.

What the register tells us

The application was determined in about 11 months. Construction to first power took about 19 months. A planning permission on this site expired in March 2011. The scheme has been operating for about 10 years. That works out at 2.3 MW per turbine on average.

Sources and dates

DataSourceExtract
Site, capacity, status, planning milestonesRenewable Energy Planning Database (DESNZ, Open Government Licence v3)Q2 2026, published 03/08/2026
Turbine positionsOpenStreetMap contributors (ODbL)19/08/2026
Manufacturer and modelOpenStreetMap tags, unverified — REPD does not record turbine models. Known for 41 % of UK turbines (manufacturer) and 32 % (model); some values are propagated within a site and may be wrong.19/08/2026

Public data may lag behind operator figures. Spotted an error? Suggest a correction from the app.