Sober Hill Wind Farm

6 turbines · revised · Humberside

Wind farm facts

StatusRevised
County / regionHumberside
Turbines6
Installed capacity1.5 MW
Turbine capacity0.25 MW
Tip heightnot recorded
Operator (or applicant)West Coast Energy
Turbine manufacturernot recorded
Turbine modelnot recorded

♻️ Project timeline

Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.

1994 1996 1998 2000 2002 2004 2006 2008 2010 2012 2014 Original scheme Application submitted September 1995 Refused December 1995 Later scheme Application submitted October 2008 Refused April 2009 Permission granted March 2010 Granted on appeal March 2010 Permission expired March 2011 Under construction March 2012 Operational September 2013

The register links a second scheme on this site (REPD ref 4327, Operational): 6 turbines · 2.5 MW each · applicant West Coast Energy. Two schemes on one site usually mean a repowering or an extension — to be confirmed with the operator.

Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 3334.

What the register tells us

The register records a refusal in December 1995 before the scheme progressed. That works out at 0.25 MW per turbine on average.