🌬️ Onshore wind farm

Spaldington Airfield
Humberside

Recorded in WhichWindTurbine: 5 wind turbines in operation. Point the app at one of them to see its profile in real time.

5
turbines
12.5 MW
MW total
2.5 MW
per turbine

📍 5 turbines mapped — each dot is a turbine recorded in the database. Average position: 53.79531 N · 0.80599 W.

Spaldington Airfield

5 turbines · operational · Humberside

Wind farm facts

StatusOperational
County / regionHumberside
Turbines5
Installed capacity12.5 MW
Turbine capacity2.5 MW
Tip heightnot recorded
Operator (or applicant)Falck Renewables
Turbine manufacturernot recorded
Turbine modelnot recorded
Open this wind farm in WhichWindTurbine Interactive map + augmented-reality identification on site

♻️ Project timeline

Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.

→ ~20382010201520202025today123456
  1. 1Nov 2009 — Application submitted
  2. 2Sep 2010 — Refused
  3. 3Sep 2011 — Permission granted
  4. 4Sep 2011 — Granted on appeal
  5. 5Jun 2013 — Under construction
  6. 6May 2016 — Operational

The register also records a planning permission expiry in Sep 2011, in the same month as, or before, the permission was granted: it refers to an earlier permission, left off the axis.

DevelopmentConstructionOperationAhead (repowering horizon at 22 years)

From application to operation, this scheme took about 7 years.

Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 3700.

What the register tells us

The application was determined in about 22 months. Construction to first power took about 35 months. The register records a refusal in September 2010 before the scheme progressed. Permission was ultimately granted on appeal in September 2011. A planning permission on this site expired in September 2011. The scheme has been operating for about 10 years. That works out at 2.5 MW per turbine on average.

Nearby

See all wind farms in Humberside.

Sources and dates

DataSourceExtract
Site, capacity, status, planning milestonesRenewable Energy Planning Database (DESNZ, Open Government Licence v3)Q2 2026, published 03/08/2026
Turbine positionsOpenStreetMap contributors (ODbL)19/08/2026
Manufacturer and modelOpenStreetMap tags, unverified — REPD does not record turbine models. Known for 41 % of UK turbines (manufacturer) and 32 % (model); some values are propagated within a site and may be wrong.19/08/2026

Public data may lag behind operator figures. Spotted an error? Suggest a correction from the app.