3 turbines · operational · South Yorkshire
| Status | Operational |
|---|---|
| County / region | South Yorkshire |
| Turbines | 3 |
| Installed capacity | 6.9 MW |
| Turbine capacity | 2.3 MW |
| Tip height | not recorded |
| Operator (or applicant) | J G Pears Limited |
| Turbine manufacturer | Bonus |
| Turbine model | not recorded |
Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.
From application to operation, this scheme took about 4 years.
The register links a second scheme on this site (REPD ref 4791, Appeal Refused): 3 turbines · 2.3 MW each · 93 m tip height · applicant JG Pears Power. Two schemes on one site usually mean a repowering or an extension — to be confirmed with the operator.
Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 2680.
The application was determined in about 12 months. The scheme has been operating for about 13 years. That works out at 2.3 MW per turbine on average.
See all wind farms in South Yorkshire.