11 turbines · revised · Cornwall
| Status | Revised |
|---|---|
| County / region | Cornwall |
| Turbines | 11 |
| Installed capacity | 10.4 MW |
| Turbine capacity | 0.94 MW |
| Tip height | not recorded |
| Operator (or applicant) | Renewable Energy Generation Limited - previously E.on |
| Turbine manufacturer | not recorded |
| Turbine model | not recorded |
Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.
The register links a second scheme on this site (REPD ref 4604, Operational): 5 turbines · 2.5 MW each · applicant REG & Blackrock. Two schemes on one site usually mean a repowering or an extension — to be confirmed with the operator.
Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 4007.
The application was determined in about 7 months. A planning permission on this site expired in January 2000. That works out at 0.95 MW per turbine on average.
See all wind farms in Cornwall.