Strath of Brydock

2 turbines · operational · Grampian

Wind farm facts

StatusOperational
County / regionGrampian
Turbines2
Installed capacity4.6 MW
Turbine capacity1.3 MW
Tip heightnot recorded
Operator (or applicant)Green Cat Renewables
Turbine manufacturernot recorded
Turbine modelnot recorded

♻️ Project timeline

Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.

2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 Scheme REPD 2922 Application submitted August 2006 Permission granted February 2008 Operational June 2009 Scheme REPD 2708 Application submitted November 2008 Permission granted October 2009 Operational December 2009 Refused July 2016

From application to operation, this scheme took about 3 years.

The register links a second scheme on this site (REPD ref 2708, Operational): 1 turbines · 1.3 MW each · applicant Green Cat Renewables. Two schemes on one site usually mean a repowering or an extension — to be confirmed with the operator.

Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 2922.

What the register tells us

The application was determined in about 18 months. The scheme has been operating for about 17 years. That works out at 2.3 MW per turbine on average.

Nearby

See all wind farms in Grampian.