🌬️ Onshore wind farm

Strath of Brydock
Grampian

Recorded in WhichWindTurbine: 2 wind turbines in operation. Point the app at one of them to see its profile in real time.

2
turbines
4.6 MW
MW total
1.3 MW
per turbine

📍 2 turbines mapped — each dot is a turbine recorded in the database. Average position: 57.62584 N · 2.57619 W.

Strath of Brydock

2 turbines · operational · Grampian

Wind farm facts

StatusOperational
County / regionGrampian
Turbines2
Installed capacity4.6 MW
Turbine capacity1.3 MW
Tip heightnot recorded
Operator (or applicant)Green Cat Renewables
Turbine manufacturernot recorded
Turbine modelnot recorded
Open this wind farm in WhichWindTurbine Interactive map + augmented-reality identification on site

♻️ Project timeline

Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.

→ ~20312010201520202025today123
  1. 1Aug 2006 — Application submitted
  2. 2Feb 2008 — Permission granted
  3. 3Jun 2009 — Operational

DevelopmentConstructionOperationAhead (repowering horizon at 22 years)

From application to operation, this scheme took about 3 years.

The register links a second scheme on this site (REPD ref 2708, Operational): 1 turbines · 1.3 MW each · applicant Green Cat Renewables. Two schemes on one site usually mean a repowering or an extension — to be confirmed with the operator.

Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 2922.

What the register tells us

The application was determined in about 18 months. The scheme has been operating for about 17 years. That works out at 2.3 MW per turbine on average.

Nearby

See all wind farms in Grampian.

Sources and dates

DataSourceExtract
Site, capacity, status, planning milestonesRenewable Energy Planning Database (DESNZ, Open Government Licence v3)Q2 2026, published 03/08/2026
Turbine positionsOpenStreetMap contributors (ODbL)19/08/2026
Manufacturer and modelOpenStreetMap tags, unverified — REPD does not record turbine models. Known for 41 % of UK turbines (manufacturer) and 32 % (model); some values are propagated within a site and may be wrong.19/08/2026

Public data may lag behind operator figures. Spotted an error? Suggest a correction from the app.