Recorded in WhichWindTurbine: 9 wind turbines. Point the app at one of them to see its profile in real time.
📍 5 turbines mapped — each dot is a turbine recorded in the database. Average position: 56.2546 N · 3.93779 W.
9 turbines · under construction · Perth and Kinross
| Status | Under Construction |
|---|---|
| County / region | Perth and Kinross |
| Turbines | 9 |
| Installed capacity | 20.7 MW |
| Turbine capacity | 2.3 MW |
| Tip height | 93 m |
| Operator (or applicant) | Green Cat Renewables |
| Turbine manufacturer | not recorded |
| Turbine model | not recorded |
Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.
DevelopmentConstructionOperationAhead (repowering horizon at 22 years)
Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 2860.
The application was determined in about 39 months. The register records a refusal in April 2017 before the scheme progressed. Permission was ultimately granted on appeal in January 2019. A planning permission on this site expired in January 2022. That works out at 2.3 MW per turbine on average.
| Data | Source | Extract |
|---|---|---|
| Site, capacity, status, planning milestones | Renewable Energy Planning Database (DESNZ, Open Government Licence v3) | Q2 2026, published 03/08/2026 |
| Turbine positions | OpenStreetMap contributors (ODbL) | 19/08/2026 |
| Manufacturer and model | OpenStreetMap tags, unverified — REPD does not record turbine models. Known for 41 % of UK turbines (manufacturer) and 32 % (model); some values are propagated within a site and may be wrong. | 19/08/2026 |
Public data may lag behind operator figures. Spotted an error? Suggest a correction from the app.