35 turbines · under construction · Highland
| Status | Under Construction |
|---|---|
| County / region | Highland |
| Turbines | 35 |
| Installed capacity | 208 MW |
| Turbine capacity | 6.2 MW |
| Tip height | 200 m |
| Operator (or applicant) | Scottish and Southern Energy (SSE) |
| Turbine manufacturer | Vestas |
| Turbine model | V162-6.2 |
Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.
Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 4418.
The application was determined in about 110 months. Permission was ultimately granted on appeal in April 2018. A planning permission on this site expired in November 2027. That works out at 5.94 MW per turbine on average.
See all wind farms in Highland.