2 turbines · operational · Lincolnshire
| Status | Operational |
|---|---|
| County / region | Lincolnshire |
| Turbines | 2 |
| Installed capacity | 2.6 MW |
| Turbine capacity | 1.3 MW |
| Tip height | not recorded |
| Operator (or applicant) | National Wind Power |
| Turbine manufacturer | Nordex |
| Turbine model | not recorded |
Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.
From application to operation, this scheme took about 6 years.
Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 3186.
The application was determined in about 27 months. Construction to first power took about 4 months. The scheme has been operating for about 18 years. That works out at 1.3 MW per turbine on average.
See all wind farms in Lincolnshire.