Wind farm facts

StatusOperational
County / regionCo. Tyrone
Turbines4
Installed capacity9.2 MW
Turbine capacity2.3 MW
Tip heightnot recorded
Operator (or applicant)Energia Renewables
Turbine manufacturernot recorded
Turbine modelnot recorded

♻️ Project timeline

Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.

2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 Scheme REPD 4053 Application submitted September 2005 Permission granted March 2008 Under construction June 2014 Operational September 2014 Permission expired March 2018 Scheme REPD 4081 Application submitted April 2009 Permission expired September 2011 Permission granted September 2012 Under construction June 2014 Operational December 2014

From application to operation, this scheme took about 9 years.

The register links a second scheme on this site (REPD ref 4081, Operational): 4 turbines · 2.3 MW each · applicant Energia Renewables. Two schemes on one site usually mean a repowering or an extension — to be confirmed with the operator.

Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 4053.

What the register tells us

The application was determined in about 30 months. Construction to first power took about 3 months. A planning permission on this site expired in March 2018. The scheme has been operating for about 12 years. That works out at 2.3 MW per turbine on average.