🌬️ Onshore wind farm

Thornog Windfarm Extension
Co. Tyrone

Recorded in WhichWindTurbine: 4 wind turbines in operation. Point the app at one of them to see its profile in real time.

4
turbines
9.2 MW
MW total
2.3 MW
per turbine

📍 4 turbines mapped — each dot is a turbine recorded in the database. Average position: 54.57598 N · 7.5934 W.

Thornog Windfarm Extension

4 turbines · operational · Co. Tyrone

Wind farm facts

StatusOperational
County / regionCo. Tyrone
Turbines4
Installed capacity9.2 MW
Turbine capacity2.3 MW
Tip heightnot recorded
Operator (or applicant)Energia Renewables
Turbine manufacturernot recorded
Turbine modelnot recorded
Open this wind farm in WhichWindTurbine Interactive map + augmented-reality identification on site

♻️ Project timeline

Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.

→ ~20372010201520202025today1234
  1. 1Apr 2009 — Application submitted
  2. 2Sep 2012 — Permission granted
  3. 3Jun 2014 — Under construction
  4. 4Dec 2014 — Operational

The register also records a planning permission expiry in Sep 2011, in the same month as, or before, the permission was granted: it refers to an earlier permission, left off the axis.

DevelopmentConstructionOperationAhead (repowering horizon at 22 years)

From application to operation, this scheme took about 9 years.

The register links a second scheme on this site (REPD ref 4081, Operational): 4 turbines · 2.3 MW each · applicant Energia Renewables. Two schemes on one site usually mean a repowering or an extension — to be confirmed with the operator.

Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 4053.

What the register tells us

The application was determined in about 30 months. Construction to first power took about 3 months. A planning permission on this site expired in March 2018. The scheme has been operating for about 12 years. That works out at 2.3 MW per turbine on average.

Nearby

See all wind farms in Co. Tyrone.

Sources and dates

DataSourceExtract
Site, capacity, status, planning milestonesRenewable Energy Planning Database (DESNZ, Open Government Licence v3)Q2 2026, published 03/08/2026
Turbine positionsOpenStreetMap contributors (ODbL)19/08/2026
Manufacturer and modelOpenStreetMap tags, unverified — REPD does not record turbine models. Known for 41 % of UK turbines (manufacturer) and 32 % (model); some values are propagated within a site and may be wrong.19/08/2026

Public data may lag behind operator figures. Spotted an error? Suggest a correction from the app.