🌬️ Onshore wind farm

Tod Hill Farm Wind Turbines
Falkirk

Recorded in WhichWindTurbine: 4 wind turbines in operation. Point the app at one of them to see its profile in real time.

4
turbines
12 MW
MW total
3 MW
per turbine

📍 4 turbines mapped — each dot is a turbine recorded in the database. Average position: 56.03044 N · 3.86705 W.

Tod Hill Farm Wind Turbines

4 turbines · operational · Falkirk

Wind farm facts

StatusOperational
County / regionFalkirk
Turbines4
Installed capacity12 MW
Turbine capacity3 MW
Tip heightnot recorded
Operator (or applicant)Falkirk Tod Hill Wind Limited
Turbine manufacturernot recorded
Turbine modelnot recorded
Open this wind farm in WhichWindTurbine Interactive map + augmented-reality identification on site

♻️ Project timeline

Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.

→ ~2037201520202025today123456
  1. 1Jun 2011 — Application submitted
  2. 2Dec 2011 — Refused
  3. 3Jun 2012 — Permission granted
  4. 4Jun 2012 — Granted on appeal
  5. 5Apr 2014 — Under construction
  6. 6Jan 2015 — Operational

The register also records a planning permission expiry in Jun 2015, after construction had started: an administrative date with no effect on the wind farm, left off the axis.

DevelopmentConstructionOperationAhead (repowering horizon at 22 years)

From application to operation, this scheme took about 4 years.

Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 3415.

What the register tells us

The application was determined in about 12 months. Construction to first power took about 9 months. The register records a refusal in December 2011 before the scheme progressed. Permission was ultimately granted on appeal in June 2012. A planning permission on this site expired in June 2015. The scheme has been operating for about 11 years. That works out at 3 MW per turbine on average.

Sources and dates

DataSourceExtract
Site, capacity, status, planning milestonesRenewable Energy Planning Database (DESNZ, Open Government Licence v3)Q2 2026, published 03/08/2026
Turbine positionsOpenStreetMap contributors (ODbL)19/08/2026
Manufacturer and modelOpenStreetMap tags, unverified — REPD does not record turbine models. Known for 41 % of UK turbines (manufacturer) and 32 % (model); some values are propagated within a site and may be wrong.19/08/2026

Public data may lag behind operator figures. Spotted an error? Suggest a correction from the app.