5 turbines · operational · West Yorkshire
| Status | Operational |
|---|---|
| County / region | West Yorkshire |
| Turbines | 5 |
| Installed capacity | 12.3 MW |
| Turbine capacity | 3 MW |
| Tip height | not recorded |
| Operator (or applicant) | Todmorden Moor Wind Farm Ltd |
| Turbine manufacturer | not recorded |
| Turbine model | not recorded |
Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.
From application to operation, this scheme took about 4 years.
The register links a second scheme on this site (REPD ref 3483, Revised): 5 turbines · 3 MW each · applicant Coronation Power. Two schemes on one site usually mean a repowering or an extension — to be confirmed with the operator.
Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 4419.
The application was determined in about 7 months. Construction to first power took about 19 months. A planning permission on this site expired in April 2000. The scheme has been operating for about 12 years. That works out at 2.46 MW per turbine on average.