Wind farm facts

StatusRevised
County / regionHighland
Turbines13
Installed capacity39.1 MW
Turbine capacity3 MW
Tip height125 m
Operator (or applicant)Infinergy
Turbine manufacturernot recorded
Turbine modelnot recorded

♻️ Project timeline

Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.

2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 Original scheme Application submitted June 2009 Refused August 2010 Permission expired June 2011 Permission granted June 2013 Granted on appeal June 2013 Later scheme Application submitted August 2015 Refused January 2016 Under construction June 2016 Granted on appeal October 2016 Permission expired April 2017 Permission granted April 2018 Operational March 2019

The register links a second scheme on this site (REPD ref 4420, Operational): 13 turbines · 3 MW each · 125 m tip height · applicant Infinergy. Two schemes on one site usually mean a repowering or an extension — to be confirmed with the operator.

Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 4267.

What the register tells us

The application was determined in about 48 months. The register records a refusal in August 2010 before the scheme progressed. Permission was ultimately granted on appeal in June 2013. A planning permission on this site expired in June 2011. That works out at 3.01 MW per turbine on average.