Tom Nan Clach
Highland

Recorded in WhichWindTurbine: 13 wind turbines. Point the app at one of them to see its profile in real time.

13
turbines
39.1 MW
MW total
3 MW
per turbine
125 m
tip height

📍 13 turbines mapped — each dot is a turbine recorded in the database. Average position: 57.3917 N · 3.89582 W.

Tom Nan Clach

13 turbines · revised · Highland

Wind farm facts

StatusRevised
County / regionHighland
Turbines13
Installed capacity39.1 MW
Turbine capacity3 MW
Tip height125 m
Operator (or applicant)Infinergy
Turbine manufacturernot recorded
Turbine modelnot recorded
Open this wind farm in WhichWindTurbine Interactive map + augmented-reality identification on site

♻️ Project timeline

Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.

20092010201120122013201420151234
  1. 1Jun 2009 — Application submitted
  2. 2Aug 2010 — Refused
  3. 3Jun 2013 — Permission granted
  4. 4Jun 2013 — Granted on appeal

The register also records a planning permission expiry in Jun 2011, in the same month as, or before, the permission was granted: it refers to an earlier permission, left off the axis.

DevelopmentConstructionOperationAhead (repowering horizon at 22 years)

The register links a second scheme on this site (REPD ref 4420, Operational): 13 turbines · 3 MW each · 125 m tip height · applicant Infinergy. Two schemes on one site usually mean a repowering or an extension — to be confirmed with the operator.

Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 4267.

What the register tells us

The application was determined in about 48 months. The register records a refusal in August 2010 before the scheme progressed. Permission was ultimately granted on appeal in June 2013. A planning permission on this site expired in June 2011. That works out at 3.01 MW per turbine on average.

Nearby

See all wind farms in Highland.

Sources and dates

DataSourceExtract
Site, capacity, status, planning milestonesRenewable Energy Planning Database (DESNZ, Open Government Licence v3)Q2 2026, published 03/08/2026
Turbine positionsOpenStreetMap contributors (ODbL)19/08/2026
Manufacturer and modelOpenStreetMap tags, unverified — REPD does not record turbine models. Known for 41 % of UK turbines (manufacturer) and 32 % (model); some values are propagated within a site and may be wrong.19/08/2026