🌬️ Onshore wind farm

Torrs Hill
Dumfries and Galloway

Recorded in WhichWindTurbine: 2 wind turbines. Point the app at one of them to see its profile in real time.

2
turbines
4 MW
MW total
2 MW
per turbine

📍 1 turbine mapped — each dot is a turbine recorded in the database. Average position: 55.1578 N · 4.17427 W.

Torrs Hill

2 turbines · under construction · Dumfries and Galloway

Wind farm facts

StatusUnder Construction
County / regionDumfries and Galloway
Turbines2
Installed capacity4 MW
Turbine capacity2 MW
Tip heightnot recorded
Operator (or applicant)Torrs Hill Windfarm Ltd
Turbine manufacturernot recorded
Turbine modelnot recorded
Open this wind farm in WhichWindTurbine Interactive map + augmented-reality identification on site

♻️ Project timeline

Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.

2004200620082010123
  1. 1Jun 2003 — Application submitted
  2. 2Mar 2004 — Permission granted
  3. 3Feb 2009 — Under construction

DevelopmentConstructionOperationAhead (repowering horizon at 22 years)

Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 4529.

What the register tells us

The application was determined in about 9 months. That works out at 2 MW per turbine on average.

Nearby

See all wind farms in Dumfries and Galloway.

Sources and dates

DataSourceExtract
Site, capacity, status, planning milestonesRenewable Energy Planning Database (DESNZ, Open Government Licence v3)Q2 2026, published 03/08/2026
Turbine positionsOpenStreetMap contributors (ODbL)19/08/2026
Manufacturer and modelOpenStreetMap tags, unverified — REPD does not record turbine models. Known for 41 % of UK turbines (manufacturer) and 32 % (model); some values are propagated within a site and may be wrong.19/08/2026

Public data may lag behind operator figures. Spotted an error? Suggest a correction from the app.