Recorded in WhichWindTurbine: 36 wind turbines in operation. Point the app at one of them to see its profile in real time.
📍 36 turbines mapped — each dot is a turbine recorded in the database. Average position: 55.6731 N · 4.29678 W.
| Location | Strathclyde — East Ayrshire |
|---|---|
| Type | Onshore wind |
| Number of turbines (database) | 36 |
| Manufacturer | Alstom (now GE Renewable Energy) |
| Model | ECO 100 |
| Rated power per turbine | 3 MW |
| Total capacity (database) | 108 MW |
| Rotor diameter | Data not available |
| Tip height | Data not available |
| Commissioning year | 2012 |
| Status | Operational |
Alstom (now GE Renewable Energy) · ECO 100 · 36 turbines · 3 MW each
Source: Alstom, extension inauguration press release, 2013-07, read on 2026-09-14. Corroborated by 5 further sources. Where OpenStreetMap tags differ, this record prevails.
Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.
DevelopmentConstructionOperationAhead (repowering horizon at 22 years)
Operator (or applicant): Scottish Power Renewables · Turbines: 36 · Turbine capacity: 3 MW · Status: Operational
Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 3981.
The WhichWindTurbine database records 36 wind turbines in operation at this site, with a total capacity of about 108 MW (sources: REPD and OpenStreetMap).
Area: Strathclyde — East Ayrshire. The average position of the wind farm is 55.6731 N / 4.29678 W.
With the WhichWindTurbine web app: from an open viewpoint, point your phone at a turbine. The app combines your GPS position, compass and camera with its database to show the profile of the turbine you are looking at.
The commissioning year recorded in the database is 2012. Public data may differ slightly from the operator's official date.
Based on a typical lifetime of ~22 years for an onshore wind farm, the repowering window would be around 2034. Indicative projection only — no operator decision is implied.
Wind farm data: Renewable Energy Planning Database (REPD, Department for Energy Security and Net Zero — Open Government Licence) for site attributes, and © OpenStreetMap contributors (ODbL) for turbine positions, as integrated in WhichWindTurbine. "Data not available" means the public sources do not record that attribute for this site.
| Data | Source | Extract |
|---|---|---|
| Site, capacity, status, planning milestones | Renewable Energy Planning Database (DESNZ, Open Government Licence v3) | Q2 2026, published 03/08/2026 |
| Turbine positions | OpenStreetMap contributors (ODbL) | 19/08/2026 |
| Manufacturer and model | OpenStreetMap tags, unverified — REPD does not record turbine models. Known for 41 % of UK turbines (manufacturer) and 32 % (model); some values are propagated within a site and may be wrong. | 19/08/2026 |
Public data may lag behind operator figures. Spotted an error? Suggest a correction from the app.