12 turbines · revised · Dumfries and Galloway
| Status | Revised |
|---|---|
| County / region | Dumfries and Galloway |
| Turbines | 12 |
| Installed capacity | 43 MW |
| Turbine capacity | 3 MW |
| Tip height | 125 m |
| Operator (or applicant) | Statkraft |
| Turbine manufacturer | Vestas |
| Turbine model | not recorded |
Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.
The register links a second scheme on this site (REPD ref 7562, Operational): 12 turbines · 125 m tip height · applicant Statkraft UK. Two schemes on one site usually mean a repowering or an extension — to be confirmed with the operator.
Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 4430.
The application was determined in about 42 months. A planning permission on this site expired in November 2023. That works out at 3.58 MW per turbine on average.