14 turbines · operational · Co. Derry / Londonderry
| Status | Operational |
|---|---|
| County / region | Co. Derry / Londonderry |
| Turbines | 14 |
| Installed capacity | 42 MW |
| Turbine capacity | 3 MW |
| Tip height | not recorded |
| Operator (or applicant) | Gaelectric Developments/ CGN Europe Energy |
| Turbine manufacturer | not recorded |
| Turbine model | not recorded |
Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.
From application to operation, this scheme took about 7 years.
Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 4142.
The application was determined in about 37 months. Construction to first power took about 11 months. The register records a refusal in March 2010 before the scheme progressed. Permission was ultimately granted on appeal in January 2011. A planning permission on this site expired in January 2014. The scheme has been operating for about 12 years. That works out at 3 MW per turbine on average.