🌬️ Onshore wind farm

Woolley Hill Wind Farm
Cambridgeshire

Recorded in WhichWindTurbine: 4 wind turbines in operation. Point the app at one of them to see its profile in real time.

4
turbines
10 MW
MW total
2.3 MW
per turbine

📍 4 turbines mapped — each dot is a turbine recorded in the database. Average position: 52.34339 N · 0.29447 W.

Woolley Hill Wind Farm

4 turbines · operational · Cambridgeshire

Wind farm facts

StatusOperational
County / regionCambridgeshire
Turbines4
Installed capacity10 MW
Turbine capacity2.3 MW
Tip heightnot recorded
Operator (or applicant)Aviva
Turbine manufacturerNordex
Turbine modelnot recorded
Open this wind farm in WhichWindTurbine Interactive map + augmented-reality identification on site

♻️ Project timeline

Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.

→ ~2036201520202025today123456
  1. 1Nov 2010 — Application submitted
  2. 2Jul 2011 — Refused
  3. 3Mar 2012 — Permission granted
  4. 4Mar 2012 — Granted on appeal
  5. 5Mar 2014 — Under construction
  6. 6Apr 2014 — Operational

The register also records a planning permission expiry in Mar 2011, in the same month as, or before, the permission was granted: it refers to an earlier permission, left off the axis.

DevelopmentConstructionOperationAhead (repowering horizon at 22 years)

From application to operation, this scheme took about 4 years.

Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 4175.

What the register tells us

The application was determined in about 16 months. Construction to first power took about 1 month. The register records a refusal in July 2011 before the scheme progressed. Permission was ultimately granted on appeal in March 2012. A planning permission on this site expired in March 2011. The scheme has been operating for about 12 years. That works out at 2.5 MW per turbine on average.

Nearby

See all wind farms in Cambridgeshire.

Sources and dates

DataSourceExtract
Site, capacity, status, planning milestonesRenewable Energy Planning Database (DESNZ, Open Government Licence v3)Q2 2026, published 03/08/2026
Turbine positionsOpenStreetMap contributors (ODbL)19/08/2026
Manufacturer and modelOpenStreetMap tags, unverified — REPD does not record turbine models. Known for 41 % of UK turbines (manufacturer) and 32 % (model); some values are propagated within a site and may be wrong.19/08/2026