🌬️ Onshore wind farm

Worksop - B&Q
Nottinghamshire

Recorded in WhichWindTurbine: 1 wind turbine in operation. Point the app at one of them to see its profile in real time.

1
turbines
2 MW
MW total
2 MW
per turbine

📍 1 turbine mapped — each dot is a turbine recorded in the database. Average position: 53.2954 N · 1.08824 W.

Worksop - B&Q

1 turbines · operational · Nottinghamshire

Wind farm facts

StatusOperational
County / regionNottinghamshire
Turbines1
Installed capacity2 MW
Turbine capacity2 MW
Tip heightnot recorded
Operator (or applicant)Ecotricity
Turbine manufacturernot recorded
Turbine modelnot recorded
Open this wind farm in WhichWindTurbine Interactive map + augmented-reality identification on site

♻️ Project timeline

Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.

→ ~20312010201520202025today1234
  1. 1Sep 2007 — Application submitted
  2. 2Nov 2007 — Permission granted
  3. 3Dec 2008 — Under construction
  4. 4Jan 2009 — Operational

The register also records a planning permission expiry in Nov 2017, after construction had started: an administrative date with no effect on the wind farm, left off the axis.

DevelopmentConstructionOperationAhead (repowering horizon at 22 years)

From application to operation, this scheme took about 2 years.

Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 3510.

What the register tells us

The application was determined in about 2 months. Construction to first power took about 1 month. A planning permission on this site expired in November 2017. The scheme has been operating for about 17 years. That works out at 2 MW per turbine on average.

Sources and dates

DataSourceExtract
Site, capacity, status, planning milestonesRenewable Energy Planning Database (DESNZ, Open Government Licence v3)Q2 2026, published 03/08/2026
Turbine positionsOpenStreetMap contributors (ODbL)19/08/2026
Manufacturer and modelOpenStreetMap tags, unverified — REPD does not record turbine models. Known for 41 % of UK turbines (manufacturer) and 32 % (model); some values are propagated within a site and may be wrong.19/08/2026

Public data may lag behind operator figures. Spotted an error? Suggest a correction from the app.