🌬️ Onshore wind farm

Aikengall II, Wester Dod Community Wind Farm
Lothian

Recorded in WhichWindTurbine: 19 wind turbines in operation. Point the app at one of them to see its profile in real time.

19
turbines
60.8 MW
MW total
3.2 MW
per turbine
145 m
tip height

📍 19 turbines mapped — each dot is a turbine recorded in the database. Average position: 55.91538 N · 2.49347 W.

Aikengall II, Wester Dod Community Wind Farm

19 turbines · operational · Lothian

Wind farm facts

StatusOperational
County / regionLothian
Turbines19
Installed capacity60.8 MW
Turbine capacity3.2 MW
Tip height145 m
Operator (or applicant)Community Windpower
Turbine manufacturerSiemens
Turbine modelSWT-3.2-113
Open this wind farm in WhichWindTurbine Interactive map + augmented-reality identification on site

✓ Verified reference — turbine make and model

Siemens · SWT-3.2-113 · 19 turbines · 3.2 MW each · rotor 113 m

Source: GlobalData / Power Technology, Aikengall complex profile, 2024, read on 2026-09-15. Corroborated by 2 further sources. Where OpenStreetMap tags differ, this record prevails.

✓ Independently confirmed on 2026-09-19 by Wikipedia, list of onshore wind farms in the United Kingdom (secondary source, compiled from UKWED): 19 Siemens Direct Drive 3.2 MW, 2017.

♻️ Project timeline

Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.

→ ~20402010201520202025today1234
  1. 1Sep 2009 — Application submitted
  2. 2Mar 2013 — Permission granted
  3. 3Sep 2014 — Under construction
  4. 4Nov 2017 — Operational

The register also records a planning permission expiry in Mar 2012, in the same month as, or before, the permission was granted: it refers to an earlier permission, left off the axis.

DevelopmentConstructionOperationAhead (repowering horizon at 22 years)

From application to operation, this scheme took about 8 years.

Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 4332.

What the register tells us

The application was determined in about 42 months. Construction to first power took about 38 months. A planning permission on this site expired in March 2012. The scheme has been operating for about 9 years. That works out at 3.2 MW per turbine on average.

Nearby

See all wind farms in Lothian.

Sources and dates

DataSourceExtract
Site, capacity, status, planning milestonesRenewable Energy Planning Database (DESNZ, Open Government Licence v3)Q2 2026, published 03/08/2026
Turbine positionsOpenStreetMap contributors (ODbL)19/08/2026
Manufacturer and modelOpenStreetMap tags, unverified — REPD does not record turbine models. Known for 41 % of UK turbines (manufacturer) and 32 % (model); some values are propagated within a site and may be wrong.19/08/2026

Public data may lag behind operator figures. Spotted an error? Suggest a correction from the app.