Commissioning years range from 2008 to 2019.
Status: Operating 9
Turbine manufacturers: Vestas (4) · Siemens Gamesa (1) — recorded for 5 of 9 wind farms
The largest is Harburnhead Wind Farm with 22 turbines and 51.7 MW. It is followed by Aikengall II, Wester Dod Community Wind Farm (19 turbines) and Tormywheel (15 turbines).
2 of the 9 wind farms with a recorded commissioning year were built before 2015.
On average, a wind farm in this region has 10.8 turbines, for 26.3 MW.
All 9 of these wind farms have a detailed page.
| Wind farm | Turbines | Capacity | Year | Manufacturer |
|---|---|---|---|---|
| Harburnhead Wind Farm | 22 | 51.7 MW | 2016 | not recorded |
| Aikengall II, Wester Dod Community Wind Farm | 19 | 60.8 MW | 2017 | not recorded |
| Tormywheel | 15 | 30.8 MW | 2017 | not recorded |
| Aikengall | 14 | 42 MW | 2008 | Siemens Gamesa |
| Pates Hill | 7 | 14 MW | 2010 | Vestas |
| Pearie Law Wind Farm | 6 | 19.2 MW | 2016 | not recorded |
| Pogbie Wind Farm 1 | 6 | 5.1 MW | 2019 | Vestas |
| Keith Hill | 5 | 4.5 MW | 2017 | Vestas |
| Drumduff | 3 | 8.5 MW | 2017 | Vestas |
| Data | Source | Extract |
|---|---|---|
| Site, capacity, status, planning milestones | Renewable Energy Planning Database (DESNZ, Open Government Licence v3) | Q2 2026, published 03/08/2026 |
| Turbine positions | OpenStreetMap contributors (ODbL) | 19/08/2026 |
| Manufacturer and model | OpenStreetMap tags, unverified — REPD does not record turbine models. Known for 41 % of UK turbines (manufacturer) and 32 % (model); some values are propagated within a site and may be wrong. | 19/08/2026 |
Public data may lag behind operator figures. Spotted an error? Suggest a correction from the app.