84 turbines · operational · Offshore
| Status | Operational |
|---|---|
| County / region | Offshore |
| Turbines | 84 |
| Installed capacity | 588 MW |
| Turbine capacity | 7 MW |
| Tip height | not recorded |
| Operator (or applicant) | Scottish & Southern Energy (SSE) / Repsol / CIP |
| Turbine manufacturer | Siemens Gamesa |
| Turbine model | SWT-7.0-154 |
Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.
From application to operation, this scheme took about 7 years.
Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 2521.
The application was determined in about 23 months. Construction to first power took about 28 months. A planning permission on this site expired in March 2014. The scheme has been operating for about 7 years. That works out at 7 MW per turbine on average.