Wind farms in Offshore

54 wind farms · 3389 turbines

54wind farms
3389turbines
22 861MW recorded

Commissioning years range from 2003 to 2025.

Status: Operating 48 · Under construction 6

Turbine manufacturers: Siemens Gamesa (25) · Vestas (12) · GE (2) — recorded for 39 of 54 wind farms

The largest is Dogger Bank A & B (was Creyke Beck A & B) with 175 turbines and 2275 MW. It is followed by London Array Phase 1 (175 turbines) and Hornsea 1 - Heron & Njord (174 turbines).

24 of the 48 wind farms with a recorded commissioning year were built before 2015, which makes them candidates for repowering in the coming years.

On average, a wind farm in this region has 62.8 turbines, for 423.4 MW.

0 of these wind farms have a detailed page; the others are listed here from the public registers.

Wind farmTurbinesCapacityYearManufacturer
Dogger Bank A & B (was Creyke Beck A & B)1752275 MWn/aGE
London Array Phase 1175630 MW2013Siemens Gamesa
Hornsea 1 - Heron & Njord1741218 MW2019not recorded
Hornsea 2 - Optimus and Breesea1651320 MW2022Siemens Gamesa
Gwynt y Mor160576 MW2015not recorded
Greater Gabbard Wind Farm140504 MW2012Siemens Gamesa
Rampion Offshore Wind Farm (Hastings Zone)116400.2 MW2017not recorded
Seagreen1141048.8 MW2023Vestas
West of Duddon Sands108388.8 MW2014not recorded
East Anglia 1 (EA 1)102714 MW2020Siemens Gamesa
Moray East100950 MW2022Vestas
Sofia (Teesside B)1001415.1 MWn/aGE
Thanet100300 MW2010Vestas
Walney 393558 MW2018Siemens Gamesa
Triton Knoll90855 MW2022Vestas
Sheringham Shoal88316.8 MW2012Siemens Gamesa
Dogger Bank C (was Teesside A)871218 MWn/aSiemens Gamesa
Beatrice84588 MW2019Siemens Gamesa
Centrica (Lincs)75270 MW2013Siemens Gamesa
Humber Gateway A73219 MW2015Vestas
Inch Cape721080 MWn/aVestas
Dudgeon East67402 MW2017Siemens Gamesa
The East Anglia Array - Norfolk Boreas671005 MWn/aVestas
Moray West Offshore Wind Farm Project60882 MW2025Siemens Gamesa
Galloper Wind Farm56352.8 MW2018Siemens Gamesa
Neart na Gaoithe54432 MW2025Siemens Gamesa
Walney 151183.6 MW2011Siemens Gamesa
Walney 251183.6 MW2012Siemens Gamesa
Race Bank (Phase 1)46289.8 MW2017Siemens Gamesa
Race Bank (Phase 2)45283.5 MW2018Siemens Gamesa
Westermost Rough A35210 MW2015Siemens Gamesa
Burbo Bank Extension (Burbo Bank 2)32256 MW2017not recorded
Robin Rigg West3090 MW2009not recorded
Barrow3090 MW2006not recorded
Ormonde Offshore30150 MW2012not recorded
Scroby Sands3060 MW2004not recorded
North Hoyle3060 MW2003Vestas
Kentish Flats3090 MW2005Vestas
Gunfleet Sands Offshore Wind Scheme30108 MW2009Siemens Gamesa
Robin Rigg East2884 MW2010not recorded
Teeside Offshore Wind Farm2762.1 MW2013Siemens Gamesa
Inner Dowsing2797.2 MW2008Siemens Gamesa
Lynn2797.2 MW2008Siemens Gamesa
Burbo Bank2590 MW2007not recorded
Rhyl Flats2590 MW2009not recorded
Gunfleet Sands II1864.8 MW2009Siemens Gamesa
Kentish Flats 21549.5 MW2015Vestas
European Offshore Wind Deployment Centre (EOWDC) (Aberde1196.8 MW2018Vestas
Kincardine Offshore Windfarm657 MW2021Vestas
Blyth Offshore Wind Test Site541.5 MW2017not recorded
Hywind Scotland Pilot Park (Hywind 2) Demonstrator530 MW2017Siemens Gamesa
Dounreay Trì Floating Wind Demonstration210 MWn/anot recorded
Gunfleet Sands - (Demo) Extension212 MW2013Siemens Gamesa
Levenmouth demonstration turbine (Fife Energy Park)16 MW2014not recorded