🌬️ Onshore wind farm

Blaen Bowi Wind Farm
Dyfed

Recorded in WhichWindTurbine: 3 wind turbines in operation. Point the app at one of them to see its profile in real time.

3
turbines
3.9 MW
MW total
1.3 MW
per turbine

📍 3 turbines mapped — each dot is a turbine recorded in the database. Average position: 51.99611 N · 4.43969 W.

Blaen Bowi Wind Farm

3 turbines · operational · Dyfed

Wind farm facts

StatusOperational
County / regionDyfed
Turbines3
Installed capacity3.9 MW
Turbine capacity1.3 MW
Tip heightnot recorded
Operator (or applicant)WINDJEN POWER LTD
Turbine manufacturernot recorded
Turbine modelnot recorded
Open this wind farm in WhichWindTurbine Interactive map + augmented-reality identification on site

♻️ Project timeline

Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.

~2024 reached20052010201520202025today123
  1. 1Jun 2000 — Application submitted
  2. 2Jan 2001 — Permission granted
  3. 3Jul 2002 — Operational

DevelopmentConstructionOperationAhead (repowering horizon at 22 years)

From application to operation, this scheme took about 2 years.

The register links a second scheme on this site (REPD ref 3240, Appeal Refused): 3 turbines · 3 MW each · applicant Windjen Power Ltd / Dulas Ltd. Two schemes on one site usually mean a repowering or an extension — to be confirmed with the operator.

Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 2630.

What the register tells us

The application was determined in about 7 months. The scheme has been operating for about 24 years. At that age, wind farms commonly become candidates for repowering or life extension — nothing in the register confirms such a plan here. That works out at 1.3 MW per turbine on average.

Nearby

See all wind farms in Dyfed.

Sources and dates

DataSourceExtract
Site, capacity, status, planning milestonesRenewable Energy Planning Database (DESNZ, Open Government Licence v3)Q2 2026, published 03/08/2026
Turbine positionsOpenStreetMap contributors (ODbL)19/08/2026
Manufacturer and modelOpenStreetMap tags, unverified — REPD does not record turbine models. Known for 41 % of UK turbines (manufacturer) and 32 % (model); some values are propagated within a site and may be wrong.19/08/2026

Public data may lag behind operator figures. Spotted an error? Suggest a correction from the app.