17 wind farms · 171 turbines
Commissioning years range from 1994 to 2018.
Status: Operating 16 · Under construction 1
The largest is Cefn Croes Wind Farm with 39 turbines and 58.5 MW. It is followed by Brechfa Forest West (28 turbines) and Mynydd Gorddu Wind Farm (19 turbines).
14 of the 16 wind farms with a recorded commissioning year were built before 2015, which makes them candidates for repowering in the coming years.
On average, a wind farm in this region has 10.1 turbines, for 14.5 MW.
2 of these wind farms have a detailed page; the others are listed here from the public registers.
| Wind farm | Turbines | Capacity | Year | Manufacturer |
|---|---|---|---|---|
| Cefn Croes Wind Farm | 39 | 58.5 MW | 2005 | not recorded |
| Brechfa Forest West | 28 | 57.4 MW | 2018 | not recorded |
| Mynydd Gorddu Wind Farm | 19 | 10.3 MW | 1998 | not recorded |
| Mynydd y Betws | 15 | 34.5 MW | 2013 | not recorded |
| Llangwyryfon | 11 | 9.3 MW | 2004 | not recorded |
| Dyffryn Brodyn Wind Farm | 11 | 5.5 MW | 1994 | not recorded |
| Blaengwen | 10 | 23 MW | 2009 | not recorded |
| Rheidol Wind Farm | 8 | 2.4 MW | 1997 | not recorded |
| Parc Cynog Extension | 6 | 7.8 MW | 2009 | not recorded |
| Parc-Cynog Wind Farm | 5 | 3.5 MW | 2001 | not recorded |
| Castle Pill - Repowering | 4 | 3.2 MW | 2009 | not recorded |
| Wear Point | 4 | 8.2 MW | 2014 | not recorded |
| Blaen Bowi Wind Farm | 3 | 3.9 MW | 2002 | not recorded |
| Dragon Energy Park - Wind Farm | 3 | 14.4 MW | n/a | not recorded |
| Lawrence Landfill | 2 | 1.6 MW | 2017 | not recorded |
| Princes Gate Spring Water | 2 | 1.6 MW | 2014 | not recorded |
| Lodge Farm 1 | 1 | 1 MW | 2006 | not recorded |