Wind farms in Dyfed

17 wind farms · 171 turbines

17wind farms
171turbines
246MW recorded

Commissioning years range from 1994 to 2018.

Status: Operating 16 · Under construction 1

The largest is Cefn Croes Wind Farm with 39 turbines and 58.5 MW. It is followed by Brechfa Forest West (28 turbines) and Mynydd Gorddu Wind Farm (19 turbines).

14 of the 16 wind farms with a recorded commissioning year were built before 2015, which makes them candidates for repowering in the coming years.

On average, a wind farm in this region has 10.1 turbines, for 14.5 MW.

2 of these wind farms have a detailed page; the others are listed here from the public registers.

Wind farmTurbinesCapacityYearManufacturer
Cefn Croes Wind Farm3958.5 MW2005not recorded
Brechfa Forest West2857.4 MW2018not recorded
Mynydd Gorddu Wind Farm1910.3 MW1998not recorded
Mynydd y Betws1534.5 MW2013not recorded
Llangwyryfon119.3 MW2004not recorded
Dyffryn Brodyn Wind Farm115.5 MW1994not recorded
Blaengwen1023 MW2009not recorded
Rheidol Wind Farm82.4 MW1997not recorded
Parc Cynog Extension67.8 MW2009not recorded
Parc-Cynog Wind Farm53.5 MW2001not recorded
Castle Pill - Repowering43.2 MW2009not recorded
Wear Point48.2 MW2014not recorded
Blaen Bowi Wind Farm33.9 MW2002not recorded
Dragon Energy Park - Wind Farm314.4 MWn/anot recorded
Lawrence Landfill21.6 MW2017not recorded
Princes Gate Spring Water21.6 MW2014not recorded
Lodge Farm 111 MW2006not recorded