Crystal Rig Phase 1
Borders

Recorded in WhichWindTurbine: 25 wind turbines in operation. Point the app at one of them to see its profile in real time.

25
turbines
62.5 MW
MW total
2.5 MW
per turbine

📍 16 turbines mapped — each dot is a turbine recorded in the database. Average position: 55.86595 N · 2.43929 W.

Crystal Rig Phase 1

25 turbines · operational · Borders

Wind farm facts

StatusOperational
County / regionBorders
Turbines25
Installed capacity62.5 MW
Turbine capacity2.5 MW
Tip heightnot recorded
Operator (or applicant)Fred Olsen Renewables
Turbine manufacturerNordex
Turbine modelN80-2.5
Open this wind farm in WhichWindTurbine Interactive map + augmented-reality identification on site

✓ Verified reference — turbine make and model

Nordex · N80-2.5 · 2.5 MW each · hub 60 m · rotor 80 m

Source: Fred. Olsen Renewables, operator project page, 2026, read on 2026-09-14. Corroborated by 2 further sources. Where OpenStreetMap tags differ, this record prevails.

♻️ Project timeline

Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.

~2026 reached20052010201520202025today123
  1. 1Apr 2001 — Application submitted
  2. 2Jan 2003 — Permission granted
  3. 3Jun 2004 — Operational

The register also records a planning permission expiry in Jan 2016, after commissioning: an administrative date with no effect on the operating wind farm, left off the axis.

DevelopmentConstructionOperationAhead (repowering horizon at 22 years)

From application to operation, this scheme took about 3 years.

The register links a second scheme on this site (REPD ref 19577, Application Submitted): 10 turbines · 7.2 MW each · 230 m tip height · applicant Fred Olsen Renewables. Two schemes on one site usually mean a repowering or an extension — to be confirmed with the operator.

Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 3114.

What the register tells us

The application was determined in about 21 months. A planning permission on this site expired in January 2016. The scheme has been operating for about 22 years. At that age, wind farms commonly become candidates for repowering or life extension — nothing in the register confirms such a plan here. That works out at 2.5 MW per turbine on average.

Nearby

See all wind farms in Borders.

Sources and dates

DataSourceExtract
Site, capacity, status, planning milestonesRenewable Energy Planning Database (DESNZ, Open Government Licence v3)Q2 2026, published 03/08/2026
Turbine positionsOpenStreetMap contributors (ODbL)19/08/2026
Manufacturer and modelOpenStreetMap tags, unverified — REPD does not record turbine models. Known for 41 % of UK turbines (manufacturer) and 32 % (model); some values are propagated within a site and may be wrong.19/08/2026

Public data may lag behind operator figures. Spotted an error? Suggest a correction from the app.