190 turbines · under construction · Offshore
| Status | Under Construction |
|---|---|
| County / region | Offshore |
| Turbines | 190 |
| Installed capacity | 2400 MW |
| Turbine capacity | 13 MW |
| Tip height | 260 m |
| Operator (or applicant) | SSE/Equinor (formerly Statoil, formerly Forewind) |
| Turbine manufacturer | GE |
| Turbine model | GE Haliade-X 13 MW |
Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.
Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 2541.
The application was determined in about 18 months. A planning permission on this site expired in February 2020. That works out at 12.63 MW per turbine on average.