6 turbines · revised · Cumbria
| Status | Revised |
|---|---|
| County / region | Cumbria |
| Turbines | 6 |
| Installed capacity | 7.8 MW |
| Turbine capacity | 1.3 MW |
| Tip height | not recorded |
| Operator (or applicant) | Npower Renewables |
| Turbine manufacturer | not recorded |
| Turbine model | not recorded |
Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.
The register links a second scheme on this site (REPD ref 3002, Operational): 4 turbines · 2.5 MW each · applicant Npower Renewables. Two schemes on one site usually mean a repowering or an extension — to be confirmed with the operator.
Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 3543.
The register records a refusal in October 2004 before the scheme progressed. That works out at 1.3 MW per turbine on average.
See all wind farms in Cumbria.