🌬️ Onshore wind farm

High Pow Farm
Cumbria

Recorded in WhichWindTurbine: 3 wind turbines in operation. Point the app at one of them to see its profile in real time.

3
turbines
3.9 MW
MW total
1.3 MW
per turbine

📍 3 turbines mapped — each dot is a turbine recorded in the database. Average position: 54.78299 N · 3.17712 W.

High Pow Farm

3 turbines · operational · Cumbria

Wind farm facts

StatusOperational
County / regionCumbria
Turbines3
Installed capacity3.9 MW
Turbine capacity1.3 MW
Tip heightnot recorded
Operator (or applicant)REG Windpower (previously Cornwall Light and Power)
Turbine manufacturernot recorded
Turbine modelnot recorded
Open this wind farm in WhichWindTurbine Interactive map + augmented-reality identification on site

♻️ Project timeline

Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.

→ ~202920052010201520202025today123
  1. 1Jul 2004 — Application submitted
  2. 2Oct 2004 — Permission granted
  3. 3Mar 2007 — Operational

The register also records a planning permission expiry in Oct 2000, in the same month as, or before, the permission was granted: it refers to an earlier permission, left off the axis.

DevelopmentConstructionOperationAhead (repowering horizon at 22 years)

From application to operation, this scheme took about 3 years.

The register links a second scheme on this site (REPD ref 3087, Revised): 3 turbines · 1.3 MW each · applicant Private Developer. Two schemes on one site usually mean a repowering or an extension — to be confirmed with the operator.

Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 4029.

What the register tells us

The application was determined in about 3 months. A planning permission on this site expired in October 2000. The scheme has been operating for about 19 years. That works out at 1.3 MW per turbine on average.

Nearby

See all wind farms in Cumbria.

Sources and dates

DataSourceExtract
Site, capacity, status, planning milestonesRenewable Energy Planning Database (DESNZ, Open Government Licence v3)Q2 2026, published 03/08/2026
Turbine positionsOpenStreetMap contributors (ODbL)19/08/2026
Manufacturer and modelOpenStreetMap tags, unverified — REPD does not record turbine models. Known for 41 % of UK turbines (manufacturer) and 32 % (model); some values are propagated within a site and may be wrong.19/08/2026

Public data may lag behind operator figures. Spotted an error? Suggest a correction from the app.