Keith Hill

10 turbines · revised · Lothian

Wind farm facts

StatusRevised
County / regionLothian
Turbines10
Installed capacity25 MW
Turbine capacity2.5 MW
Tip heightnot recorded
Operator (or applicant)G & M Hodge & Son Ltd
Turbine manufacturerVestas
Turbine modelnot recorded

♻️ Project timeline

Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.

2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 Original scheme Application submitted January 2009 Refused September 2009 Later scheme Application submitted November 2010 Permission granted April 2011 Under construction June 2017 Operational December 2017

The register links a second scheme on this site (REPD ref 4516, Operational): 5 turbines · 0.9 MW each · applicant Sky Wind Energy. Two schemes on one site usually mean a repowering or an extension — to be confirmed with the operator.

Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 4442.

What the register tells us

The register records a refusal in September 2009 before the scheme progressed. That works out at 2.5 MW per turbine on average.

Nearby

See all wind farms in Lothian.