6 turbines · operational · Offshore
| Status | Operational |
|---|---|
| County / region | Offshore |
| Turbines | 6 |
| Installed capacity | 49.5 MW |
| Turbine capacity | 9.5 MW |
| Tip height | 176 m |
| Operator (or applicant) | Grupo Cobra |
| Turbine manufacturer | MHI Vestas |
| Turbine model | V164-9.5 (5) and V80-2.0 (1) |
MHI Vestas · V164-9.5 (5) and V80-2.0 (1) · 6 turbines · rotor 164 m
Source: Vestas, MHI Vestas / Cobra order press release, 2019-04, read on 2026-09-15. Corroborated by 5 further sources. Where OpenStreetMap tags differ, this record prevails.
✓ Independently confirmed on 2026-09-19 by Wikipedia, list of UK offshore wind farms: 6 Vestas V164-9.5 and V80-2 turbines, 49.5 MW, October 2021.
Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.
The register also records a planning permission expiry in Mar 2016, in the same month as, or before, the permission was granted: it refers to an earlier permission, left off the axis.
DevelopmentConstructionOperationAhead (repowering horizon at 22 years)
From application to operation, this scheme took about 5 years.
Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 6136.
The application was determined in about 9 months. Construction to first power took about 36 months. A planning permission on this site expired in March 2016. The scheme has been operating for about 5 years. That works out at 8.25 MW per turbine on average.
See all wind farms in Offshore.
| Data | Source | Extract |
|---|---|---|
| Site, capacity, status, planning milestones | Renewable Energy Planning Database (DESNZ, Open Government Licence v3) | Q2 2026, published 03/08/2026 |
| Turbine positions | OpenStreetMap contributors (ODbL) | 19/08/2026 |
| Manufacturer and model | OpenStreetMap tags, unverified — REPD does not record turbine models. Known for 41 % of UK turbines (manufacturer) and 32 % (model); some values are propagated within a site and may be wrong. | 19/08/2026 |
Public data may lag behind operator figures. Spotted an error? Suggest a correction from the app.