3 turbines · revised · Cumbria
| Status | Revised |
|---|---|
| County / region | Cumbria |
| Turbines | 3 |
| Installed capacity | 9.5 MW |
| Turbine capacity | 3.16 MW |
| Tip height | not recorded |
| Operator (or applicant) | Flimby Wind Energy Ltd |
| Turbine manufacturer | not recorded |
| Turbine model | not recorded |
Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.
The register links a second scheme on this site (REPD ref 3972, Operational): 3 turbines · 2.05 MW each · applicant Flimby Wind Energy Ltd. Two schemes on one site usually mean a repowering or an extension — to be confirmed with the operator.
Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 3048.
The application was determined in about 10 months. That works out at 3.17 MW per turbine on average.
See all wind farms in Cumbria.