📍 6 turbines mapped — each dot is a turbine recorded in the database. Average position: 54.33749 N · 7.89332 W.

Ora More

6 turbines · operational · Co. Fermanagh

Wind farm facts

StatusOperational
County / regionCo. Fermanagh
Turbines6
Installed capacity15 MW
Turbine capacity2.3 MW
Tip heightnot recorded
Operator (or applicant)Natural Power
Turbine manufacturerGE
Turbine modelnot recorded
Open this wind farm in WhichWindTurbine Interactive map + augmented-reality identification on site

♻️ Project timeline

Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.

→ ~20392010201520202025today1234
  1. 1Dec 2005 — Application submitted
  2. 2Mar 2011 — Permission granted
  3. 3Nov 2015 — Under construction
  4. 4Mar 2017 — Operational

The register also records a planning permission expiry in Mar 2016, after construction had started: an administrative date with no effect on the wind farm, left off the axis.

DevelopmentConstructionOperationAhead (repowering horizon at 22 years)

From application to operation, this scheme took about 12 years.

The register links a second scheme on this site (REPD ref 4282, Planning Permission Expired): 3 turbines · 2 MW each · applicant Renewable Energy Systems (RES). Two schemes on one site usually mean a repowering or an extension — to be confirmed with the operator.

Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 4654.

What the register tells us

The application was determined in about 63 months. Construction to first power took about 16 months. A planning permission on this site expired in March 2016. The scheme has been operating for about 9 years. That works out at 2.5 MW per turbine on average.

Nearby

See all wind farms in Co. Fermanagh.

Sources and dates

DataSourceExtract
Site, capacity, status, planning milestonesRenewable Energy Planning Database (DESNZ, Open Government Licence v3)Q2 2026, published 03/08/2026
Turbine positionsOpenStreetMap contributors (ODbL)19/08/2026
Manufacturer and modelOpenStreetMap tags, unverified — REPD does not record turbine models. Known for 41 % of UK turbines (manufacturer) and 32 % (model); some values are propagated within a site and may be wrong.19/08/2026

Public data may lag behind operator figures. Spotted an error? Suggest a correction from the app.