Commissioning years range from 1995 to 2018.
Status: Operating 8
Turbine manufacturers: Vestas (2) · GE (2) · Nordex (1) · Siemens Gamesa (1) — recorded for 6 of 8 wind farms
The largest is Slieve Rushen Extension with 18 turbines and 54 MW. It is followed by Tappaghan (13 turbines) and Callagheen (13 turbines).
6 of the 8 wind farms with a recorded commissioning year were built before 2015, which makes them candidates for repowering in the coming years.
On average, a wind farm in this region has 9.5 turbines, for 18.8 MW.
All 8 of these wind farms have a detailed page.
| Wind farm | Turbines | Capacity | Year | Manufacturer |
|---|---|---|---|---|
| Slieve Rushen Extension | 18 | 54 MW | 2008 | Vestas |
| Tappaghan | 13 | 19.5 MW | 2005 | Nordex |
| Callagheen | 13 | 22.8 MW | 2005 | Siemens Gamesa |
| Slieve Rushen Phase 1 Wind Farm | 10 | 5 MW | 1995 | Vestas |
| Tappaghan Extension | 6 | 9 MW | 2009 | not recorded |
| Ora More | 6 | 13.8 MW | 2017 | GE |
| Molly Mountain | 5 | 15 MW | 2014 | GE |
| Teiges | 5 | 11 MW | 2018 | not recorded |
| Data | Source | Extract |
|---|---|---|
| Site, capacity, status, planning milestones | Renewable Energy Planning Database (DESNZ, Open Government Licence v3) | Q2 2026, published 03/08/2026 |
| Turbine positions | OpenStreetMap contributors (ODbL) | 19/08/2026 |
| Manufacturer and model | OpenStreetMap tags, unverified — REPD does not record turbine models. Known for 41 % of UK turbines (manufacturer) and 32 % (model); some values are propagated within a site and may be wrong. | 19/08/2026 |
Public data may lag behind operator figures. Spotted an error? Suggest a correction from the app.