9 turbines · revised · Co. Tyrone
| Status | Revised |
|---|---|
| County / region | Co. Tyrone |
| Turbines | 9 |
| Installed capacity | 20.7 MW |
| Turbine capacity | 2.3 MW |
| Tip height | not recorded |
| Operator (or applicant) | TCI Renewables |
| Turbine manufacturer | GE |
| Turbine model | not recorded |
Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.
The register links a second scheme on this site (REPD ref 4650, Under Construction): 9 turbines · 3 MW each · applicant Energia. Two schemes on one site usually mean a repowering or an extension — to be confirmed with the operator.
Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 2710.
The application was determined in about 23 months. The register records a refusal in January 2015 before the scheme progressed. Permission was ultimately granted on appeal in December 2010. A planning permission on this site expired in December 2010. That works out at 2.3 MW per turbine on average.
See all wind farms in Co. Tyrone.