39 wind farms · 278 turbines
Commissioning years range from 1995 to 2024.
Status: Operating 38 · Under construction 1
Turbine manufacturers: Enercon (6) · Nordex (3) · Siemens Gamesa (2) · GE (2) · Vestas (2) — recorded for 15 of 39 wind farms
The largest is Tievenameenta with 15 turbines and 34.5 MW. It is followed by Crighshane (14 turbines) and Slieve Kirk (12 turbines).
19 of the 38 wind farms with a recorded commissioning year were built before 2015, which makes them candidates for repowering in the coming years.
On average, a wind farm in this region has 7.1 turbines, for 14.9 MW.
2 of these wind farms have a detailed page; the others are listed here from the public registers.
| Wind farm | Turbines | Capacity | Year | Manufacturer |
|---|---|---|---|---|
| Tievenameenta | 15 | 34.5 MW | 2017 | not recorded |
| Crighshane | 14 | 28 MW | 2012 | Enercon |
| Slieve Kirk | 12 | 27.6 MW | 2011 | Siemens Gamesa |
| Pollnalaght (Cornavarrow) | 12 | 38.4 MW | 2018 | GE |
| Slieve Divena Phase 1 Wind Farm | 12 | 30 MW | 2009 | Nordex |
| Bessy Bell Wind Farm | 10 | 5 MW | 1995 | Vestas |
| Curraghamulkin (Dooish Wind Farm) | 10 | 30 MW | 2018 | not recorded |
| Owenreagh Wind Farm | 10 | 5 MW | 1997 | not recorded |
| Castlecraig | 10 | 25 MW | 2018 | not recorded |
| Lendrum's Bridge Wind Farm ( Extension 2) | 9 | 5.9 MW | 2002 | Enercon |
| Pigeon Top | 9 | 27 MW | n/a | GE |
| Glengesh Lower Forest (Murley) | 9 | 20.7 MW | 2024 | not recorded |
| Lendrum's Bridge Wind Farm | 9 | 5.9 MW | 2000 | not recorded |
| Church Hill | 8 | 16 MW | 2012 | Enercon |
| Slieve Divena Phase 2 Wind Farm | 8 | 20 MW | 2017 | Enercon |
| Land approx 75m South of 141 | 8 | 20 MW | 2007 | not recorded |
| Screggagh | 8 | 20 MW | 2011 | not recorded |
| Hunter's Hill | 8 | 20 MW | 2010 | not recorded |
| Shantavny Scotch | 7 | 14 MW | 2017 | not recorded |
| Bin Mountain | 6 | 9 MW | 2007 | not recorded |
| Lough Hill | 6 | 10.5 MW | 2006 | not recorded |
| Crockagarran | 6 | 15 MW | 2010 | Nordex |
| Gortfinbar | 6 | 15 MW | 2016 | Siemens Gamesa |
| Bessy Bell Extension | 6 | 7.8 MW | 2008 | Vestas |
| Owenreagh Extension | 6 | 5.1 MW | 2008 | not recorded |
| Seegronan | 6 | 13.8 MW | 2016 | not recorded |
| Cregganconroe | 6 | 13.8 MW | 2017 | not recorded |
| Inishative | 6 | 13.8 MW | 2017 | not recorded |
| Eglish Mountain | 6 | 13.8 MW | 2017 | not recorded |
| Crockdun | 5 | 12.5 MW | 2017 | not recorded |
| Thornog Windfarm Extension | 4 | 9.2 MW | 2014 | not recorded |
| Thornog Windfarm | 4 | 9.2 MW | 2014 | not recorded |
| Eshmore | 3 | 6.9 MW | 2016 | not recorded |
| Crockbaravally Wind Farm | 3 | 7.5 MW | 2017 | not recorded |
| Altamuskin Extension | 3 | 7.1 MW | 2017 | Enercon |
| Altamuskin | 3 | 7.1 MW | 2017 | Enercon |
| Slieveglass | 3 | 6.9 MW | 2018 | not recorded |
| Crockagarron Ext | 1 | 2.5 MW | 2012 | Nordex |
| Crockbrack | 1 | 2 MW | 2017 | not recorded |