6 turbines · operational · Lothian
| Status | Operational |
|---|---|
| County / region | Lothian |
| Turbines | 6 |
| Installed capacity | 5.1 MW |
| Turbine capacity | 0.85 MW |
| Tip height | not recorded |
| Operator (or applicant) | Mongoose (formerly Energy Law Unlimited) |
| Turbine manufacturer | Vestas |
| Turbine model | not recorded |
Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.
From application to operation, this scheme took about 11 years.
Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 4434.
The application was determined in about 12 months. Construction to first power took about 28 months. A planning permission on this site expired in September 2015. The scheme has been operating for about 7 years. That works out at 0.85 MW per turbine on average.