🌊 Offshore wind farm

Rhyl Flats
Offshore

Recorded in WhichWindTurbine: 25 wind turbines in operation. Point the app at one of them to see its profile in real time.

25
turbines
90 MW
MW total
3.6 MW
per turbine

📍 25 turbines mapped — each dot is a turbine recorded in the database. Average position: 53.38004 N · 3.65139 W.

Rhyl Flats

25 turbines · operational · Offshore

Wind farm facts

StatusOperational
County / regionOffshore
Turbines25
Installed capacity90 MW
Turbine capacity3.6 MW
Tip heightnot recorded
Operator (or applicant)RWE Npower
Turbine manufacturerSiemens
Turbine modelSWT-3.6-107
Open this wind farm in WhichWindTurbine Interactive map + augmented-reality identification on site

✓ Verified reference — turbine make and model

Siemens · SWT-3.6-107 · 25 turbines · 3.6 MW each

Source: Durham University, « Wind energy: UK experiences and offshore operational challenges », 2016, read on 2026-09-14. Corroborated by 1 further source. Where OpenStreetMap tags differ, this record prevails.

✓ Independently confirmed on 2026-09-19 by Siemens, offshore sales presentation: 25x SWT-3.6-107, 2009 — from the manufacturer, which lifts the earlier caveat “model to be confirmed with RWE”.

♻️ Project timeline

Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.

→ ~203220052010201520202025today1234
  1. 1Mar 2002 — Application submitted
  2. 2Jan 2003 — Permission granted
  3. 3Sep 2007 — Under construction
  4. 4Dec 2009 — Operational

The register also records a planning permission expiry in Jan 2015, after construction had started: an administrative date with no effect on the wind farm, left off the axis.

DevelopmentConstructionOperationAhead (repowering horizon at 22 years)

From application to operation, this scheme took about 7 years.

Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 2495.

What the register tells us

The application was determined in about 10 months. Construction to first power took about 27 months. A planning permission on this site expired in January 2015. The scheme has been operating for about 17 years. That works out at 3.6 MW per turbine on average.

Nearby

See all wind farms in Offshore.

Sources and dates

DataSourceExtract
Site, capacity, status, planning milestonesRenewable Energy Planning Database (DESNZ, Open Government Licence v3)Q2 2026, published 03/08/2026
Turbine positionsOpenStreetMap contributors (ODbL)19/08/2026
Manufacturer and modelOpenStreetMap tags, unverified — REPD does not record turbine models. Known for 41 % of UK turbines (manufacturer) and 32 % (model); some values are propagated within a site and may be wrong.19/08/2026

Public data may lag behind operator figures. Spotted an error? Suggest a correction from the app.