Siddick Wind Farm

7 turbines · operational · Cumbria

Wind farm facts

StatusOperational
County / regionCumbria
Turbines7
Installed capacity4.2 MW
Turbine capacity0.6 MW
Tip heightnot recorded
Operator (or applicant)Windprospect / Windcluster
Turbine manufacturerVestas
Turbine modelV42

♻️ Project timeline

Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.

1994 1996 1998 2000 2002 2004 2006 2008 2010 2012 Project timeline Application submitted April 1995 Permission granted December 1995 Operational August 1996 Permission expired December 2011

From application to operation, this scheme took about 1 year.

Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 2624.

What the register tells us

The application was determined in about 8 months. A planning permission on this site expired in December 2011. The scheme has been operating for about 30 years. At that age, wind farms commonly become candidates for repowering or life extension — nothing in the register confirms such a plan here. That works out at 0.6 MW per turbine on average.