3 turbines · operational · Co. Tyrone
| Status | Operational |
|---|---|
| County / region | Co. Tyrone |
| Turbines | 3 |
| Installed capacity | 6.9 MW |
| Turbine capacity | 2.3 MW |
| Tip height | not recorded |
| Operator (or applicant) | Slieveglass wind farm (Energia) |
| Turbine manufacturer | not recorded |
| Turbine model | not recorded |
Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.
From application to operation, this scheme took about 10 years.
Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 4065.
The application was determined in about 65 months. Construction to first power took about 11 months. The register records a refusal in April 2012 before the scheme progressed. Permission was ultimately granted on appeal in June 2013. A planning permission on this site expired in June 2018. The scheme has been operating for about 8 years. That works out at 2.3 MW per turbine on average.
See all wind farms in Co. Tyrone.